Civil construction of switch gear, control room building and foundation for chilled water plant for Power Distribution System under 2.4 MT Growth Plan of Tata Steel Ltd.
Construction of 4 nos. Cable Tunnel
Construction of 4 nos. Cable Tunnel of 2.5 m x 3.22 m cross section and 7 m wide road inside Tata Steel Works. The total length of all the 4 tunnels is 7227 meters having 49 ventilation stations.
Clarified water conveyance main
The scope involved fabrication, laying & commissioning of 2.5 kms of 1200 mm to 600 mm did. MS pipe and its connection with the existing system through hot boring technology.
River Intake Basin at River Pump House
The job required rehabilitation of Raw Water Intake Basin at River Subernarekha, which involved lining while the Basin was in use. The rehabilitation work was carried out in a running condition at a minimum 3.2 meter of water depth.