Tata Steel Ltd.

Power Sub Station construction inside Tata Steel

 

Civil construction of switch gear, control room building and foundation for chilled water plant for Power Distribution System under 2.4 MT Growth Plan of Tata Steel Ltd.

 

Construction of 4 nos. Cable Tunnel

 
 

Construction of 4 nos. Cable Tunnel of 2.5 m x 3.22 m cross section and 7 m wide road inside Tata Steel Works. The total length of all the 4 tunnels is 7227 meters having 49 ventilation stations.

 
Clarified water conveyance main
 
 

The scope involved fabrication, laying & commissioning of 2.5 kms of 1200 mm to 600 mm did. MS pipe and its connection with the existing system through hot boring technology.

 
River Intake Basin at River Pump House
 
 

The job required rehabilitation of Raw Water Intake Basin at River Subernarekha, which involved lining while the Basin was in use. The rehabilitation work was carried out in a running condition at a minimum 3.2 meter of water depth.

 

  

West Bengal

Madhya Pradesh

Bihar

Jharkhand

Orissa

Uranium Corporation of India Ltd

Praxair India Pvt. Ltd

Tata Bluescope Steel Ltd

Tata Motors Ltd

Tata Steel Ltd

 


 

Contact Us : Site Map

     Copyright © 2007 JUSCO

     Powered by - Allindia Technologies Limited