Jamshedpur Utilities & Services Company Ltd
Home

Search

 
JUSCO, urban infrastructure service provider <h1>JUSCO, India’s 1st Comprehensive Urban Infrastructure Services Company</h1>
Engineering Procurement & Construction (EPC) Power Distribution Integrated Township Management Operation & Maintenance Real Estate
:: Waste Water Recovery project - Presently waste water flows out of TISCO works boundary through sunsungharia Nallah discharging into subernarekha river & through Garam Nallah discharging into jubilee Lake with a provision to overflow into Subernarekha river. It is purposed to collect clean water after settling and pump back the reclaimed water to the lower cooling pond.
 

Name of the Client:
Tata Steel Limited

  • The scheme has considered a system to recover
  • Approx.1450 Cu-M/hr(7.5 MGD)(1200 CU-M/hr from sunsungharia Nallah & 150 Cu-M/hr from Garam Nallah) out of a total of 2050 Cu-M available. A settling tank/collection Tank is provided at both the locations and independently connected through pipe lines to B.H. #2 Tunnel for return of recovered water to lower cooling pond.
  • The scope of work envisages all aspects of engineering & project work including complete design & engineering, project management, procurement of all supply items including placement of order, inspection of supplies, site execution, and erection & commissioning of system. JUSCO has worked here as a EPC contractor.

Brief description of the Project:
The Project comprises of following components to be constructed by JUSCO

  • Waste water recovery system
  • Route survey, Design & preparation of construction drawings
  • Procurement of materials
  • External Painting of pipe – 2.1 K.M
  • Structural Steel Fabrication & Erection – 21 MT
  • Laying & erection of pipe (500 & 300nb) – 2.2 KM
  • Testing & Commissioning
  • Civil work involve intake,settling tank, M.C.C. Room, Pump house & pipeline support
  • Electrical & instrumentation work Like installation & commissioning of MCC PANEL, PLC PANEL, FLOW METER LEVEL SENSOR ETC.
  • This plant is fully automated.

Details of Jusco’s Construction Contract:
Contract Value: 6.74 Cr
Contract Duration: 16 months
Date of Completion:
Completed 10.03.2009

Top
 
Online Power connection Application
Online Power connection Application
BTS for Vendors
Water Calculator
Water Saving Tips
Energy Calculator
Energy Saving Tips
Solar Roof top Netmetering Policy
 
 


Site Best View in IE6+ with 1024x768 Resolution

Disclaimer | Privacy Policy | Refund / cancellation policy | Sitemap

Jamshedpur Utilities & Services Company Limited